.

1 Before Install 6 1 Before Install 7 10 Wet Slope 11 french drain (1) 11 french drain (2) 11 french drain
11 osat sidewalk (1) 11 osat sidewalk 2 Foundation 1 2 Foundation 1a 2 Foundation 2 2 Foundation 3
2 Foundation 4 2 Foundation 5 2 Foundation 6 2 Foundation 7 3 Radome Wall 1 3 Radome Wall 2
3 Radome Wall 3 3 Radome Wall 4 4 Bird Eye of Site 1 4 Bird Eye of Site 2 4 Bird Eye of Site 3 4 Bird Eye of Site 4
5 Satalite Install 1 5 Satalite Install 2 5 Satalite Install 3 5 Satalite Install 4 5 Satalite Install 5 5 Satalite Install 6
5 Satalite Install 7 5 Satalite Install 8 5 Satalite Install 9 6 Blower skid 7 Removal of temp parking area 8 drip rings and gravel (4)
8 drip rings and gravel 8 finished CT trench (1) 9 gen building 1 9 gen building 3 9 gen building 4 9 gen building 5
9 gen building 6 & Satalite 9 gen building2 gen set 12-15-03 OSAT Radome lift (12) OSAT Radome lift (15) OSAT Radome lift (2)
OSAT Radome lift (8)          

.